Every window and door, interior and exterior was replaced the siding was stripped ISO foam insulation was added and then the home was re-sided. The kitchen was gutted and replaced as well as the two bathrooms. The oak floor was re-finished carpet was installed as well and flooring in both bathrooms and the kitchen as well. Sewer hook-up destroyed what yard was there and so sod was laid after everything else was done. All the electrical was replaced (by the Palmer brothers) and the new roof was installed by (Charlie Nau). There was not a foot of this property that was not touched in the process of this extensive remodel.